Strategic Advantage in Southeast Asia

DALI Enterprise established its Cambodia manufacturing operations in 2015, strategically locating within the Phnom Penh Special Economic Zone (SEZ). This facility was purpose-built to serve European and North American brands seeking competitive production costs combined with preferential market access.

The Cambodia base offers a compelling value proposition: EBA (Everything But Arms) duty-free status provides zero-tariff access to all 27 European Union member states, delivering 6-12% cost savings compared to sourcing from countries without preferential trade agreements. Combined with DALI's proven quality systems and vertically integrated supply chain support from China, this creates an unmatched manufacturing solution.

Facility Overview

The Cambodia manufacturing network currently operates three specialized production facilities within the Phnom Penh SEZ, with a fourth major production campus under development:

Factory Lines / Machines Monthly Output Workforce Area
Factory I 35 lines 6.5M garments 980 9,096 m²
Factory II 45 lines 8.5M garments 1,200 9,500 m²
Factory V (Socks) 700 machines 3.0M pairs 520 8,000 m²
Current Total 80+ lines 15M + 3M socks 2,700+ 26,596 m²

Production Process

Every garment produced in Cambodia follows DALI's standardized production workflow, ensuring consistency with China-made products:

01
Fabric
Fabric sourced from DALI China mills
02
Cutting
Automatic spreading & precision cutting
03
Sewing
Juki & Brother industrial machines
04
Inspecting
Multi-stage quality inspection
05
Finishing
Ironing, pressing & final QC
06
Shipping
Packing & global distribution

Equipment & Workforce

Cambodia facilities are equipped with industry-leading production technology including fully automatic spreading and cutting machines, Juki and Brother industrial sewing machines, and automated finishing equipment. Our 2,700+ skilled sewing operators undergo comprehensive training at the DALI Training Centre, ensuring consistent craftsmanship across all production lines.

All production is monitored through ERP systems providing 100% traceability — from fabric batch to finished carton. This transparency allows clients to track their orders in real-time and provides complete accountability throughout the manufacturing process.

Social Responsibility & Compliance

DALI Cambodia maintains the highest standards of ethical manufacturing. Our Cambodia operations are certified under Better Work Cambodia (ILO/IFC program), WRAP Gold, and BSCI. We maintain a strict code of conduct including:

Future: New Production Campus

DALI is currently developing a new production campus in the Phnom Penh Special Economic Zone, featuring LABS (Life and Building Safety) certified construction with upgraded fire safety, structural integrity, and emergency systems.

Specification Detail
Site Area36,000 m²
Building Area30,000 m²
Production Lines30 lines + 1,000 sock machines
Planned Workforce2,000+ employees
Target Capacity6.0M garments + 4.0M socks/month
CompletionQ2 2026 construction, Q3 2026 production, Q1 2027 full operation

The new campus will incorporate solar and battery storage systems for sustainable energy generation, reducing carbon footprint while ensuring uninterrupted power supply. Upon completion, DALI's total Cambodia capacity will reach 30 million+ pieces monthly.

"No competitor can offer China's supply chain + Cambodia's EBA tariff."

DALI Cambodia manufacturing campus in Phnom Penh SEZ Cambodia factory floor with production lines Quality inspection at Cambodia facility Finished garments from Cambodia production